A partial-shift coverage approval in UKG Saved Design — public excerpt from a recorded synthetic ClearBlueprints run UKG tenant execution and testing were unrun. 1. Read only March 9 Cedar Unit / Day-RN pre-decision records: CS-410 and P-430, P-431, P-432 Establish the current branch and capture the baseline needed to verify the one approval or a no-action outcome. 2. Preserve COV-DAY and its linked Partial Shift Criteria Leave the current subtype, criteria, approval routing, eligibility and notification configuration unchanged. 3. Conditional test action Training tenant: P-430 for Cedar, March 9, CS-410, 07:00–11:00 Approve the existing accepted request once, only if still pending and within the pilot limits. This includes the normal saved schedule split and automatic invalidation of P-431 only; it does not authorize a peer command, override, new notice, separate schedule Save or corrective write. 4. Preserve Protected March 9 schedule and staffing outside the P-430 transfer Keep Lark’s protected break, all unrelated shifts, job, Work Rule, staffing requirement, pay and timecard records in place; leave other staffing, including break observer coverage and P-432, to Scheduling. 5. Read only March 10 Lab Unit LS-220 / P-449 review and unsent Lab follow-up draft Verify the existing record as far as access allows, preserve its status and shift, and prepare a text-only ownership handoff to the Lab scheduling lead. 6. Read only Internal Coverage Pilot Return draft for Scheduling Review Return a two-date comparison of expected and observed records without saving correspondence or creating a reporting integration.