A partial-shift coverage approval in UKG Saved Instructions — public excerpt from a recorded synthetic ClearBlueprints run Approved Design revision 1. UKG tenant execution and testing were unrun. Full step sequence 1. 1. Establish the March 9 branch and baseline (Read-only) 2. 2. Confirm the applied COV-DAY settings without editing (Preserve existing setup) 3. 3. Approve P-430 once if all gates pass (Isolated test change) 4. 4. Reconcile an attempted approval read-only 5. 5. Record the no-attempt outcome 6. 6. Confirm March 9 protections and working coverage (Preserve existing setup) 7. 7. Review the Lab request and prepare the unsent text (Read-only) 8. 8. Assemble the Coverage Pilot Return (Read-only) 2. Confirm the applied COV-DAY settings without editing (Preserve existing setup) Navigation: For the pending path, use current authorized read-only setup evidence. Under Main Menu → Administration → Time Application Setup → Employee Self-Service, locate COV-DAY in Request Subtypes and its exact linked record in Partial Shift Criteria. If the operator cannot view the applicable settings safely, use current read-only evidence from the existing setup owner. Setting: COV-DAY Cover subtype, effective approval route, and the linked Partial Shift Criteria. Action and values: Read Recipients of Request Offer to confirm this is a direct offer to Cedar, not a Shift Market offer. Confirm the same-manager and posted-only restrictions using Allow Cover if Managers are Different and Allow Cover With Unposted Shifts. Read Automatic Approval and any applicable Approval Settings to confirm the existing manual path for P-430. Verify Allow Cover Requests for Partial Shifts and the actual linked criterion. The 04:00 offer starts at the 07:00 source endpoint and exceeds the 02:00 offer minimum; the 08:00 elapsed remainder exceeds the 02:00 remainder minimum. Check the two break controls separately. Where the applied route has linked approval actions or notifications, use the current route evidence to rule out any additional effect outside the pilot before proceeding. Verify: Verify COV-DAY and its linked Partial Shift Criteria: For a still-pending P-430, confirm the applied COV-DAY route and its linked criteria from current authorized read-only evidence: named recipients, same manager, posted shifts only, manual approval, 02:00 minimum offer, 02:00 minimum remainder, and a source endpoint. Record that Adjust Breaks Automatically is off and that Re-evaluate breaks upon request approval is off or demonstrably does not apply to this request on the current route. If the latter state is unclear, obtain a read-only confirmation of the linked criterion and setting from the existing setup owner; do not approve or edit setup to find out. Complete before committing the change to Training tenant: P-430 for Cedar, March 9, CS-410, 07:00–11:00. The evidence ties the settings to this pending request and establishes that no applicable automatic break adjustment or break re-evaluation can change the protected break. A similarly named criterion or a submission severity threshold is not proof. Recovery: Do not edit setup to remove a blocker. If the applied route or an applicable effect cannot be bounded, skip the click, record why, and continue the authorized reads. 3. Approve P-430 once if all gates pass (Isolated test change) Navigation: Return to Control Center → Request to Cover. Select only P-430, confirm the target in Request Details, and expand Rule Violations while the request is in progress. Locate Approve on that request. Setting: P-430 — Cedar, CS-410, Cedar Unit / Day-RN, March 9, 07:00–11:00. Action and values: Before a change to Training tenant: P-430 for Cedar, March 9, CS-410, 07:00–11:00: Confirm the tenant is the isolated training tenant, the operator is the current authorized Day-RN approver on P-430, and the existing manual route applies. Confirm Cedar’s current qualification and inspect the in-progress Rule Violations panel. Do not click if identity, authority, request or schedule scope, rule state, protected fields or applicable break controls no longer match, if the approval would affect another offer or protected record outside scope, or if the route requires an additional command or known out-of-scope effect. Record the specific blocker and continue the independent reads. Only if P-430 is still pending and steps 1 and 2 and the pre-approval check all pass, click Approve once. Approve is the committing control; there is no separate Schedule Planner Save in this checklist. If a gate fails before the click, use step 5. If the click produces a warning, refusal, error, timeout, or ambiguous response, use step 4 instead of the apparently successful readback. Verify: After committing Training tenant: P-430 for Cedar, March 9, CS-410, 07:00–11:00: After one apparently successful Approve, reload the dated request history and Schedule Planner. Verify P-430 is Approved, P-431 is system-invalidated, and P-432 is still Pending. Read the saved 07:00–11:00 Cedar and 11:00–19:00 Lark assignments, working segments and unpaid 13:00–13:30 break; calculate elapsed and net from those saved values and compare the protected fields with the pre-decision capture. Record any discrepancy in the Coverage Pilot Return for Scheduling Review and make no further write. Use the apparently successful readback only on that response path. Compare the saved records with the approved-split expectations in Testing and complete the protected-field comparison in step 6. Capture saved shift IDs and decision time where shown; do not assume the resulting shifts reuse a particular ID. If the readback is incomplete or inconsistent, carry forward the conclusive evidence and reconcile only the outstanding items read-only. Recovery: No rollback write is authorized. A result that differs from the plan is evidence for the Return, not permission to retry, refuse, repost, or repair. 4. Reconcile an attempted approval read-only Navigation: Use the March 9 dated request history and saved Schedule Planner period from step 1. Use the same protected-field sources as the baseline. If an apparently successful response already produced conclusive readback for an item, keep that evidence rather than repeating the read. Setting: Persisted request and schedule state after the one attempt; no committing control. Action and values: Use this branch for an adverse or uncertain response after the click. For an incomplete or conflicting readback after an apparently successful response, use the same evidence sources for the unresolved items only. Compare an observed split with the approved-split expectations; if saved evidence proves no transfer, use the no-transfer baseline instead. Carry the result to step 6 and the Return. Verify: After committing Training tenant: P-430 for Cedar, March 9, CS-410, 07:00–11:00: If Approve exposes a new warning or override prompt, returns a refusal or error, times out, or gives an ambiguous response, record the exact response and do not confirm an override or click again. Reopen dated history for all three IDs and the saved schedule for the same fields. If both prove the intended approval, record it as observed despite the response. If they prove no transfer, record the exact saved status and compare the schedule and peers with the baseline; do not infer Refused from an error or Pending from an absent row. If records disagree or are unavailable, report the unresolved persisted state and the missing evidence to Scheduling Review. Do not reset or repair it. Identify what the dated history proves and what the saved schedule proves separately. Classify the outcome as verified intended approval, verified no transfer with exact saved statuses and any deviations, or unresolved with the specific missing or conflicting evidence. Do not classify a missing row as Pending or Invalidated. Recovery: Stop tenant changes. Scheduling Review receives unresolved effects and the outstanding evidence in the Return; this checklist authorizes no further decision or repair. Expected tests Approved split: From the saved segments, calculate Cedar 07:00–11:00 as 04:00 elapsed / 04:00 net, with no break. Calculate Lark 11:00–19:00 as 08:00 elapsed / 07:30 net, with the existing unpaid 13:00–13:30 break still on Lark. Combined net is 11:30. Expect one working Day-RN on 07:00–11:00, 11:00–13:00 and 13:30–19:00, with no working gap or double assignment at 11:00. Overlap boundary: Expect saved P-430 Approved and P-431 system-invalidated because 09:00–11:00 overlaps Cedar’s piece. P-432 starts at 11:00 and shares only an endpoint; expect it to remain Pending and untouched. Verify all three in dated history rather than testing with a fresh offer. No-transfer comparison: Expect the full posted Lark assignment 07:00–19:00, 12:00 elapsed / 11:30 net, with the original unpaid break. Compare the saved peers, posting state, protected fields and other schedule entries with the baseline. Record any variance and the actual saved P-430 status; do not assume it stayed pending. Lab comparison: Confirm the visible P-449 status, Nuthatch acceptance, and LS-220 owner and interval from saved evidence. Distinguish 04:00 elapsed from net time and do not infer assignment, route, authority, or delivery from acceptance. Limitations The supplied training snapshot contains no post-approval outcome or delivery record. These are operator checks, not findings from a tenant run. Use only existing authorized evidence. If it cannot establish a required March 9 protection, stop the pending click; if optional observer or delivery evidence is unavailable, leave it unverified. The Lab review does not establish Lab decision authority.