Recorded product run · Synthetic UKG Pro WFM training case
A partial-shift coverage approval in UKG
Two coverage requests touch the same shift. The saved Design identifies which request can be considered for approval and which evidence the manager needs to protect an existing break.
- Submitted
- One request and two training files
- Delivered
- Six Design actions and eight Instructions steps
- Tenant testing
- Unrun
Download the saved outputs
Download the complete original Instructions from the recorded run, or open one of the shorter excerpts.
Submitted request
- Submitted by the test operator
We need a UKG Pro WFM Design and approved operator checklist for a partial-cover pilot in our training tenant. For the March 9 Day shift, the manager may approve only Cedar's first-four-hours cover request if the current records still match the pilot notes. Leave any other staffing decisions with Scheduling. Show us what records the manager would check after the decision and how to handle a request that is already resolved, a refusal or an uncertain response. We also need the separate March 10 Lab request reviewed as far as the records allow, since its owner is out. Do not send or save correspondence. Put exact coverage, break and request outcomes and any remaining issue in the internal Coverage Pilot Return, with just the unresolved evidence and owner named. Please use the two attached files.
- Files supplied
- The test attached a fictional schedule and request snapshot, plus a procedure context note. It used no live tenant export or real employee records.
- Next saved response
- The assistant returned a Design on the first pass. There was no clarification turn.
Generated Design before approval
The product returned six actions. These are the saved Design’s targets and purposes.
- Read only · March 9 Cedar Unit / Day-RN pre-decision records: CS-410 and P-430, P-431, P-432
- Establish the current branch and capture the baseline needed to verify the one approval or a no-action outcome.
- Preserve · COV-DAY and its linked Partial Shift Criteria
- Leave the current subtype, criteria, approval routing, eligibility and notification configuration unchanged.
- Conditional test action · Training tenant: P-430 for Cedar, March 9, CS-410, 07:00–11:00
- Approve the existing accepted request once, only if still pending and within the pilot limits. This includes the normal saved schedule split and automatic invalidation of P-431 only; it does not authorize a peer command, override, new notice, separate schedule Save or corrective write.
- Preserve · Protected March 9 schedule and staffing outside the P-430 transfer
- Keep Lark’s protected break, all unrelated shifts, job, Work Rule, staffing requirement, pay and timecard records in place; leave other staffing, including break observer coverage and P-432, to Scheduling.
- Read only · March 10 Lab Unit LS-220 / P-449 review and unsent Lab follow-up draft
- Verify the existing record as far as access allows, preserve its status and shift, and prepare a text-only ownership handoff to the Lab scheduling lead.
- Read only · Internal Coverage Pilot Return draft for Scheduling Review
- Return a two-date comparison of expected and observed records without saving correspondence or creating a reporting integration.
Recorded approval
A separate reviewer decision in the test approved Design revision 1 for Instructions generation. The actual UKG approval remained conditional on read-only proof that the linked break re-evaluation setting would preserve the existing break.
Saved Instructions
The product delivered an eight-step checklist. Three excerpts show the exact navigation, settings, checks and recovery steps.
- 1. Establish the March 9 branch and baseline (Read-only)
- 2. Confirm the applied COV-DAY settings without editing (Preserve existing setup)
- 3. Approve P-430 once if all gates pass (Isolated test change)
- 4. Reconcile an attempted approval read-only
- 5. Record the no-attempt outcome
- 6. Confirm March 9 protections and working coverage (Preserve existing setup)
- 7. Review the Lab request and prepare the unsent text (Read-only)
- 8. Assemble the Coverage Pilot Return (Read-only)
2. Confirm the applied COV-DAY settings without editing (Preserve existing setup)
- Navigation
- For the pending path, use current authorized read-only setup evidence. Under Main Menu → Administration → Time Application Setup → Employee Self-Service, locate COV-DAY in Request Subtypes and its exact linked record in Partial Shift Criteria. If the operator cannot view the applicable settings safely, use current read-only evidence from the existing setup owner.
- Setting
- COV-DAY Cover subtype, effective approval route, and the linked Partial Shift Criteria.
- Action and values
- Read Recipients of Request Offer to confirm this is a direct offer to Cedar, not a Shift Market offer. Confirm the same-manager and posted-only restrictions using Allow Cover if Managers are Different and Allow Cover With Unposted Shifts. Read Automatic Approval and any applicable Approval Settings to confirm the existing manual path for P-430. Verify Allow Cover Requests for Partial Shifts and the actual linked criterion. The 04:00 offer starts at the 07:00 source endpoint and exceeds the 02:00 offer minimum; the 08:00 elapsed remainder exceeds the 02:00 remainder minimum. Check the two break controls separately. Where the applied route has linked approval actions or notifications, use the current route evidence to rule out any additional effect outside the pilot before proceeding.
- Verify
- Verify COV-DAY and its linked Partial Shift Criteria: For a still-pending P-430, confirm the applied COV-DAY route and its linked criteria from current authorized read-only evidence: named recipients, same manager, posted shifts only, manual approval, 02:00 minimum offer, 02:00 minimum remainder, and a source endpoint. Record that Adjust Breaks Automatically is off and that Re-evaluate breaks upon request approval is off or demonstrably does not apply to this request on the current route. If the latter state is unclear, obtain a read-only confirmation of the linked criterion and setting from the existing setup owner; do not approve or edit setup to find out. Complete before committing the change to Training tenant: P-430 for Cedar, March 9, CS-410, 07:00–11:00. The evidence ties the settings to this pending request and establishes that no applicable automatic break adjustment or break re-evaluation can change the protected break. A similarly named criterion or a submission severity threshold is not proof.
- Recovery
- Do not edit setup to remove a blocker. If the applied route or an applicable effect cannot be bounded, skip the click, record why, and continue the authorized reads.
3. Approve P-430 once if all gates pass (Isolated test change)
- Navigation
- Return to Control Center → Request to Cover. Select only P-430, confirm the target in Request Details, and expand Rule Violations while the request is in progress. Locate Approve on that request.
- Setting
- P-430 — Cedar, CS-410, Cedar Unit / Day-RN, March 9, 07:00–11:00.
- Action and values
- Before a change to Training tenant: P-430 for Cedar, March 9, CS-410, 07:00–11:00: Confirm the tenant is the isolated training tenant, the operator is the current authorized Day-RN approver on P-430, and the existing manual route applies. Confirm Cedar’s current qualification and inspect the in-progress Rule Violations panel. Do not click if identity, authority, request or schedule scope, rule state, protected fields or applicable break controls no longer match, if the approval would affect another offer or protected record outside scope, or if the route requires an additional command or known out-of-scope effect. Record the specific blocker and continue the independent reads. Only if P-430 is still pending and steps 1 and 2 and the pre-approval check all pass, click Approve once. Approve is the committing control; there is no separate Schedule Planner Save in this checklist. If a gate fails before the click, use step 5. If the click produces a warning, refusal, error, timeout, or ambiguous response, use step 4 instead of the apparently successful readback.
- Verify
- After committing Training tenant: P-430 for Cedar, March 9, CS-410, 07:00–11:00: After one apparently successful Approve, reload the dated request history and Schedule Planner. Verify P-430 is Approved, P-431 is system-invalidated, and P-432 is still Pending. Read the saved 07:00–11:00 Cedar and 11:00–19:00 Lark assignments, working segments and unpaid 13:00–13:30 break; calculate elapsed and net from those saved values and compare the protected fields with the pre-decision capture. Record any discrepancy in the Coverage Pilot Return for Scheduling Review and make no further write. Use the apparently successful readback only on that response path. Compare the saved records with the approved-split expectations in Testing and complete the protected-field comparison in step 6. Capture saved shift IDs and decision time where shown; do not assume the resulting shifts reuse a particular ID. If the readback is incomplete or inconsistent, carry forward the conclusive evidence and reconcile only the outstanding items read-only.
- Recovery
- No rollback write is authorized. A result that differs from the plan is evidence for the Return, not permission to retry, refuse, repost, or repair.
4. Reconcile an attempted approval read-only
- Navigation
- Use the March 9 dated request history and saved Schedule Planner period from step 1. Use the same protected-field sources as the baseline. If an apparently successful response already produced conclusive readback for an item, keep that evidence rather than repeating the read.
- Setting
- Persisted request and schedule state after the one attempt; no committing control.
- Action and values
- Use this branch for an adverse or uncertain response after the click. For an incomplete or conflicting readback after an apparently successful response, use the same evidence sources for the unresolved items only. Compare an observed split with the approved-split expectations; if saved evidence proves no transfer, use the no-transfer baseline instead. Carry the result to step 6 and the Return.
- Verify
- After committing Training tenant: P-430 for Cedar, March 9, CS-410, 07:00–11:00: If Approve exposes a new warning or override prompt, returns a refusal or error, times out, or gives an ambiguous response, record the exact response and do not confirm an override or click again. Reopen dated history for all three IDs and the saved schedule for the same fields. If both prove the intended approval, record it as observed despite the response. If they prove no transfer, record the exact saved status and compare the schedule and peers with the baseline; do not infer Refused from an error or Pending from an absent row. If records disagree or are unavailable, report the unresolved persisted state and the missing evidence to Scheduling Review. Do not reset or repair it. Identify what the dated history proves and what the saved schedule proves separately. Classify the outcome as verified intended approval, verified no transfer with exact saved statuses and any deviations, or unresolved with the specific missing or conflicting evidence. Do not classify a missing row as Pending or Invalidated.
- Recovery
- Stop tenant changes. Scheduling Review receives unresolved effects and the outstanding evidence in the Return; this checklist authorizes no further decision or repair.
Expected tests
Tenant testing unrun
Qualification matched the saved Instructions export and reviewed the checklist against the synthetic records. The product proposed these tenant checks.
- Approved split: From the saved segments, calculate Cedar 07:00–11:00 as 04:00 elapsed / 04:00 net, with no break. Calculate Lark 11:00–19:00 as 08:00 elapsed / 07:30 net, with the existing unpaid 13:00–13:30 break still on Lark. Combined net is 11:30. Expect one working Day-RN on 07:00–11:00, 11:00–13:00 and 13:30–19:00, with no working gap or double assignment at 11:00.
- Overlap boundary: Expect saved P-430 Approved and P-431 system-invalidated because 09:00–11:00 overlaps Cedar’s piece. P-432 starts at 11:00 and shares only an endpoint; expect it to remain Pending and untouched. Verify all three in dated history rather than testing with a fresh offer.
- No-transfer comparison: Expect the full posted Lark assignment 07:00–19:00, 12:00 elapsed / 11:30 net, with the original unpaid break. Compare the saved peers, posting state, protected fields and other schedule entries with the baseline. Record any variance and the actual saved P-430 status; do not assume it stayed pending.
- Lab comparison: Confirm the visible P-449 status, Nuthatch acceptance, and LS-220 owner and interval from saved evidence. Distinguish 04:00 elapsed from net time and do not infer assignment, route, authority, or delivery from acceptance.
- The supplied training snapshot contains no post-approval outcome or delivery record. These are operator checks, not findings from a tenant run.
- Use only existing authorized evidence. If it cannot establish a required March 9 protection, stop the pending click; if optional observer or delivery evidence is unavailable, leave it unverified. The Lab review does not establish Lab decision authority.
Handoff to Scheduling Review
Coverage Pilot Return · Draft structure
Record expected and saved ownership, elapsed and net time, the protected break, all three request outcomes, and any evidence still missing. Keep March 10 Lab findings and the no-action outcome separate.
The existing setup owner must verify the linked break re-evaluation setting before an authorized manager can consider Approve. The Lab scheduling lead owns the separate Lab review.
Instructions supplied the draft structure. This run did not deliver a return or send correspondence.
- Start to saved Design
- 1 min 57 sec, before approval
- Generate to saved Instructions
- 2 min 2 sec, including automated review
- Timing scope
- This run’s generation only
Ask about a pilot for your teamPlan team access and estimate costs
Read the measured weekend-premium case for credit usage from a separate run.